Marcel plant

Location

Marcel mine, PGG S.A., Radlin, Poland

Year

2016

Industry

Coal mining

Customer

Polska Grupa Górnicza S.A.

Mining skid for longwall mining

The customer, Polska Grupa Górnicza, operates in Poland in the coal mining industry.
Inoxihp supplied a tailor-made plant for the customer’s operating requirements. The plant includes three PM400 pumping groups complete with a valve lift system and 250 kW motors.

The decision to use the valve lift system made it easier to load and bypass the pumps.
Overall, the flow rate is 1200 l/min with 35 MPa pressure.
Inoxihp supplied all the electrical power equipment and other devices such as tanks, pressure accumulators, high-pressure self-cleaning filters, a set of ATEX-certified low-pressure filters given that the pumping station was underground.

The plant was also fitted with a refined control system with wide ranging adjustment and monitoring of devices, allowing all the data to be viewed on a local display or exported to the SCADA system on the surface.

Application

Coal mining

Project

Revamping of existing plant

DO YOU HAVE A PROJECT TO COMPLETE?

Send us a brief description of it and we will get back to you as soon as possible

    • Country: