Endless Strip Production process
Arvedi’s project was to introduce some technological upgrades on their ESP line. Inoxihp has supplied the descaling system for this new line. It has been a turn-key installation, with 3 pumps (2 + 1 stand-by) and the new interconnecting piping between the pumps room and Arvedi’s descaler. The project has been carried out on time, as per contract’s very tight time schedule.